This project is a complete rebuild.  When walking inside the structure, the floor would sag approximately two (2) feet and you could see between the floor and the wall. Water ran down the road and through the building.  We put an extensive drainage system around the building.  We built a new foundation and will be adding a new roof system and dormer later this year.  We have been doing annual projects here for the last four (4) years as it is the owners' hope this camp will eventually be a full-time residence.

press to zoom

press to zoom

press to zoom

press to zoom
1/10